← Back to records
BUDGET Budget · 2026-12-31
Budget Breakdown — B3.2
| Reference | 2026-appb3-2-budget-breakdown |
|---|---|
| Document Type | Budget budget |
| Date | 2026-12-31 (30 December 2026) |
| Issued by | Adenjo Gestión SL |
| Affects | All buildings (5 of 5) |
| Available in | ENESSVARFR |
| Storage ?Cryptographic hash for verifying that this file matches the original on record. | r2://Appendix_B_Budgets/AppB3-2_Budget_Breakdown.pdf |
Owner-prepared summary. Original document is the authoritative source.
At a glance
- The document is a budget dated 02 February 2026.
- It was issued by EQUITRON, S.L., a construction company based in Málaga.
- The budget is addressed to Parador Málaga Golf, located in Málaga.
- Two line items are listed: Giralda for 579.966,23 € and Zone between Giralda – Ramp access for vehicles for 207.141,41 €.
- The base taxable amount is 787.107,64 €, with 10% VAT amounting to 78.710,76 €, resulting in a total budget of 865.818,40 €.
Page 1
EQUITRON, S.L.
CONSTRUCTION IN GENERAL
MALAGA
TEL: 658771908
EMAIL:brigido@equitron.es
02 de Febrero de 2026
ORDINARY BUDGET
To the attention of: PARADOR MALAGA GOLF
Project located at: MALAGA
nº Concepts Price Total
1,00 Giralda 579.966,23 579.966,23
1,00 ZONE BETWEEN GIRALDA – RAMPA ACCESS FOR VEHICLES 207.141,41 207.141,41
IMPOSABLE BASE……………………….…………………….…………………………….787.107,64 €
10% IVA……………………….…………………….…………………………………………..78.710,76 €
TOTAL ORDINARY BUDGET……………………….…………………….………………………865.818,40 €