BUDGET Budget · 2026-12-31

Annex C — Emergency Repairs

Download PDF ES
Reference 2026-appendix-c-emergency-repairs-budget
Document Type Budget budget
Date 2026-12-31 (30 December 2026)
Issued by Adenjo Gestión SL
Affects All buildings (5 of 5)
Available in ENESSVARFR
Storage ?Cryptographic hash for verifying that this file matches the original on record. r2://egm_pack/Appendix_C_Emergency_Repairs_Budget.pdf
This is a translation. The Spanish version is the legally authoritative document. View original

Owner-prepared summary. Original document is the authoritative source.

At a glance

  • Annex C dated 31 December 2026 presents the emergency repair budget for the Comunidad de Propietarios Señorío de Aloha.
  • The total projected costs are €342,200 for architectural design, €5,370,000 for construction, €214,800 for ICIO taxes and €38,664 for town‑hall taxes.
  • The plan is divided into three phases; Phase 1 includes garage Giralda (€19,000 design, €800,000 construction) and urgent façade repairs in Doñana and Triana, with works scheduled to start in March 2026 and finish by July 2026.
  • Phase 2 covers façade projects for Giralda and Triana (€32,000 design, €700,000 construction each) and a second‑phase construction budget of €1,400,000, with works planned from May 2026 to March 2027 and a regularisation period from August 2026 to August 2028.
  • Phase 3 adds garage projects for Alhambra and Mezquita and façade projects for Doñana, Alhambra and Mezquita, each with €32,000 design and €700,000 construction, plus a third‑phase construction total of €3,100,000, scheduled from August 2028 to October 2029 and up to March 2030.
  • Three bids for the Giralda garage and ramp are listed: BENICAM total + IVA €832,373.08, EDIGOMPER €767,029.08, and EQUITRON €865,818.40.

Page 1

OWNERS’ ASSOCIATION SEÑORIO DE ALOHA APPENDIX ‘C’ BUILDING NAME BUDGET ARCHITECT (APPROX) CONSTRUCTION BUDGET (APROX) CONSTRUCTION TAXES TOWN HALL TAXES DEADLINES TOWN HALL APPROVALS CONSTRUCTION START TIMES CONSTRUCTION FINISH ESTIMATE GARAJE/ GARAGE GIRALDA 19.000 € 800.000 € 32.000 € 5.760 € 01/12/2025 20/03/2025 20/03/2026 20/07/2026 EMERGENCY FACADE REPAIRS DOÑANA 2.200 € 30.000 € 1.200 € 216 € 20/02/2026 20/06/2026 09/03/2026 09/06/2026 EMERGENCY FACADE REPAIRS TRIANA 3.000 € 40.000 € 1.600 € 288 € 20/03/2026 20/07/2026 09/04/2026 09/07/2026 FIRST PHASE 24.200 € 870.000 € 34.800 € 6.264 € FACADE PROJECT TRIANA 32.000 € 700.000 € 28.000 € 5.040 € 20/05/2026 20/08/2026 20/09/2026 20/03/2027 FACADE PROJECT GIRALDA 32.000 € 700.000 € 28.000 € 5.040 € 20/05/2026 20/08/2026 20/09/2026 20/03/2027 SECOND PHASE 64.000 € 1.400.000 € 56.000 € 10.080 € REGULARIZATION (AFO) TODO / ALL 120.000 € 20/08/2026 20/08/2028 GARAJE/ GARAGE ALHAMBRA 19.000 € 500.000 € 20.000 € 3.600 € 20/08/2028 10/01/2029 20/05/2029 20/10/2029 GARAJE/ GARAGE MEZQUITA 19.000 € 500.000 € 20.000 € 3.600 € 20/08/2028 10/01/2029 20/05/2029 20/10/2029 FACADE PROJECT DOÑANA 32.000 € 700.000 € 28.000 € 5.040 € 20/08/2028 10/01/2029 20/05/2029 20/03/2030 FACADE PROJECT ALHAMBRA 32.000 € 700.000 € 28.000 € 5.040 € 20/08/2028 10/01/2029 20/05/2029 20/03/2030 FACADE PROJECT MEZQUITA 32.000 € 700.000 € 28.000 € 5.040 € 20/08/2028 10/01/2029 20/05/2029 20/03/2030 THIRD PHASE / THIRD PHASE 254.000 € 3.100.000 € 124.000 € 22.320 € TOTAL 342.200 € 5.370.000 € 214.800 € 38.664 €

Page 2

OWNERS’ ASSOCIATION SEÑORIO DE ALOHA BIDS FROM GIRALDA’S GARAGE GIRALDA’S RAMP TOTAL IVA TOTAL+IVA BENICAM 554.425,98 € 202.276,82 € 756.702,80 € 75.670,28 € 832.373,08 € EDIGOMPER 518.108,57 € 179.190,59 € 697.299,16 € 69.729,92 € 767.029,08 € EQUITRON 579.966,23 € 207.141,41 € 787.107,64 € 78.710,76 € 865.818,40 €

Page 3

OWNERS’ ASSOCIATION SEÑORIO DE ALOHA REGULATORY NUMBER OCA ADAPTATION POSSIBLE REPAIRS OCA TOTAL (25) ELEVATORS 25 1.800 € 700 € 75 € 64.375 €