TECHNICAL Technical Report · 2026-12-31

Elevation Drawings — Alhambra

Download PDF ES
Reference 2026-elevation-plans-alhambra-building
Document Type Technical Report technical
Date 2026-12-31 (30 December 2026)
Issued by Adenjo Gestión SL
Affects All buildings (5 of 5)
Available in ENESSVARFR
Storage ?Cryptographic hash for verifying that this file matches the original on record. r2://architect/Elevation_Plans_Alhambra_Building.pdf
This is a translation. The Spanish version is the legally authoritative document. View original

Owner-prepared summary. Original document is the authoritative source.

At a glance

  • The document titled "Elevation Drawings — Alhambra" is a technical report dated 31 December 2026.
  • It provides elevation and façade drawings of the Alhambra building within the Conjunto Señorío de Alhoa in Marbella, Málaga.
  • The drawings record structural and envelope pathologies observed during a street‑level survey in November 2025.
  • A legend specifies remedial actions such as dismantling gutter sections, re‑impermeabilising garden beds, installing new metal‑frame glazing, and restoring flat roofs and pavements.
  • Portal identifiers (e.g., PORTAL 1‑4, PORTAL 6) and reference codes (e.g., VTZA 16, PI 226) are used to locate each observed issue.
Technical / Architectural Document

This is a visual document — drawings, plans or measurements. The PDF below is the primary record. Auto-extracted text is available at the bottom but consists mostly of dimensional data.

Elevation_Plans_Alhambra_Building.pdfOpen in new tabDownload PDF
Show extracted text (mostly measurements + dimensions)

Page 1

Right Left Right Left Right Left Right Left ENTRANCE 1 ENTRANCE 2 ENTRANCE 3 ENTRANCE 4 P 72 III 2 -II+III 27 III 22 PI 166 -II+III 12 III 38 -II+III 12 III 18 P 1 -I+V 14 -I+V 7 III 2 -II+III 8 III 16 III 2 -II 747 -II+III 104 -II+III 95 III 3 III 2 -II+III 11 -II 186 III 4 -I+V 13 -II+V 230 -I+V 18 III 1 -II+III 7 III 14 III 22 -I+V 18 -II+III 12 III 25 -I+V 15 III 20 -II+III 13 III 20 P 3232 -II+VI 299 -II+V 194 -II+IV 114 -II 228 III 3 -II+V 270 -II+VI 291 -II+V 151 -II+IV 168 I 54 VTZA 16 VTZA 17 -I+I 180 VTZA 17 VTZA 21 VTZA 8 P 7445 V 342 PI 226 -I 437 VTZA 19 VTZA 12 VTZA 13 -II 140 -II+V 177 -II+VI 306 -II+V 301 V 273 -I 580 VTZA 18 -I 970 -II+V 294 -II+VI 376 -II+V 305 VTZA 18 VTZA 14 VTZA 20 VTZA 17 -II+V 647 VTZA 18 V 221 PI 247 VTZA 7 N Conjunto Señorío de Aloha, located between Av. de Manolete and C/. de las Adelfas, Urb. Nueva Andalucía, T.M. Marbella, CP 29670 (MÁLAGA) DEVELOPER/S: C.P. CJTO. SEÑORÍO DE ALOHA Registered Architect 1.467 C/ Amistad nº 29, Edificio Cortesol, Units 9-10, San Pedro de Alcántara (MÁLAGA) Tel. 952 927 423 Francisco Manuel López Chacón REPORT on envelope pathologies at Conjunto Señorío de Aloha NOVEMBER 2025 of 25 0 1 2 3 4 5 10 15 ALHAMBRA BUILDING REAR ELEVATION (A3_e:1/200) 14 ED. ALHAMBRA ALHAMBRA BUILDING REAR ELEVATION WEST P1 P2 P3 P4 P1 P2 P3 P4 P4 P3 P2 P1 Structural joint P5 P5 LEGEND WORKS UNDERTAKEN NOTE The pathological signs expressed in this plan have been recorded through site-level data collection without auxiliary equipment and with selective access to units granted by the CPP. The apartment nomenclature is referenced according to current usage. Removal of gutter and metal profile at slab edge Resealing of planter Replacement of metal carpentry enclosure with glazing or brick masonry. Roof resealing Trafficable flat roof with water retention test Trafficable flat roof restored per CPP specifications (includes waterproofing works) Structural expansion joint Restoration of defective flooring (breakage) Flooring without grouting at edge Subsidence, rotation, settlement and cracks in walls * * P6 P6

Page 2

Right Left ENTRANCE 1 ENTRANCE 6 P 72 III 2 -II+III 27 III 22 PI 166 -II+III 12 III 38 -II+III 12 III 18 P 1 -I+V 14 -I+V 7 III 2 -II+III 8 III 16 III 2 -II 747 -II+III 104 -II+III 95 III 3 III 2 -II+III 11 -II 186 III 4 -I+V 13 -II+V 230 -I+V 18 III 1 -II+III 7 III 14 III 22 -I+V 18 -II+III 12 III 25 -I+V 15 III 20 -II+III 13 III 20 P 3232 -II+VI 299 -II+V 194 -II+IV 114 -II 228 III 3 -II+V 270 -II+VI 291 -II+V 151 -II+IV 168 I 54 VTZA 16 VTZA 17 -I+I 180 VTZA 17 VTZA 21 VTZA 8 P 7445 V 342 PI 226 -I 437 VTZA 19 VTZA 12 VTZA 13 -II 140 -II+V 177 -II+VI 306 -II+V 301 V 273 -I 580 VTZA 18 -I 970 -II+V 294 -II+VI 376 -II+V 305 VTZA 18 VTZA 14 VTZA 20 VTZA 17 -II+V 647 VTZA 18 V 221 PI 247 VTZA 7 N Conjunto Señorío de Alhoa, located between Av. de Manolete and C/. de las Adelfas, Urb. Nueva Andalucía, T.M. Marbella, CP 29670 (MÁLAGA) DEVELOPER/S: C.P. CJTO. SEÑORÍO DE ALOHA Registered Architect 1.467 C/ Amistad nº 29, Edificio Cortesol, Units 9-10, San Pedro de Alcántara (MÁLAGA) Tel. 952 927 423 Francisco Manuel López Chacón REPORT on envelope pathologies at Conjunto Señorío de Aloha NOVEMBER 2025 of 25 0 1 2 3 4 5 10 15 ALHAMBRA BUILDING SIDE ELEVATIONS (A3_e:1/200) 15 ED. ALHAMBRA SOUTH SIDE ELEVATION NORTH SIDE ELEVATION P2 P3 P4 PB P1 P2 P3 P4 P1 PB P1 P2 P3 P4 P2 P3 P4 P1 P5 P5 P5 P5 * LEGEND WORKS UNDERTAKEN NOTE The pathological signs expressed in this plan have been recorded through site-level data collection without auxiliary equipment and with selective access to units granted by the CPP. The apartment nomenclature is referenced according to current usage. Removal of gutter and metal profile at slab edge Resealing of planter Replacement of metal carpentry enclosure with glazing or brick masonry. Roof resealing Trafficable flat roof with water retention test Trafficable flat roof restored per CPP specifications (includes waterproofing works) Structural expansion joint Restoration of defective flooring (breakage) Flooring without grouting at edge Subsidence, rotation, settlement and cracks in walls * * P6 P6

Permalink copied