Annex C — Emergency Repairs (V1)
| Reference | 2026-appendix-c-emergency-facade-repairs-budget-v1 |
|---|---|
| Document Type | Budget budget |
| Date | 2026-12-31 (30 December 2026) |
| Issued by | Adenjo Gestión SL |
| Affects | All buildings (5 of 5) |
| Available in | ENESSVARFR |
| Storage ?Cryptographic hash for verifying that this file matches the original on record. | r2://2026/Appendix_C_Emergency_Facade_Repairs_Budget_v1.pdf |
Owner-prepared summary. Original document is the authoritative source.
At a glance
- The document is a budget for emergency repairs and construction projects for the Señorío de Aloha community, dated 2026-12-31.
- The budget includes various projects such as garage repairs, facade repairs, and elevator repairs.
- The total budget is €5,370,000, with a total of €214,800 in taxes and €38,664 in IVA.
- The document also includes bids from different companies, including Benicam, Edigomper, and Equitron.
- The projects are divided into three phases, with the first phase totaling €870,000, the second phase totaling €1,400,000, and the third phase totaling €3,100,000.
Page 1
Owners’ Association Conjunto Señorío de Aloha ANEXO C / APPENDIX ‘C’ NAME OF BUILDING / BUILDING NAME BUDGET ARCHITECT / BUDGET ARCHITECT (APROX) CONSTRUCTION BUDGET (APROX) ICIO / ICIO CONSTRUCTION TAXES TOWN HALL TAXES DEADLINES TOWN HALL APPROVALS CONSTRUCTION START TIMES CONSTRUCTION FINISH ESTIMATE GARAJE/ GARAGE Giralda 19.000 € 800.000 € 32.000 € 5.760 € 01/12/2025 20/03/2025 20/03/2026 20/07/2026 EMERGENCY FACADE REPAIRS Doñana 2.200 € 30.000 € 1.200 € 216 € 20/02/2026 20/06/2026 09/03/2026 09/06/2026 EMERGENCY FACADE REPAIRS Triana 3.000 € 40.000 € 1.600 € 288 € 20/03/2026 20/07/2026 09/04/2026 09/07/2026 FIRST PHASE 24.200 € 870.000 € 34.800 € 6.264 € FACADE PROJECT Triana 32.000 € 700.000 € 28.000 € 5.040 € 20/05/2026 20/08/2026 20/09/2026 20/03/2027 FACADE PROJECT Giralda 32.000 € 700.000 € 28.000 € 5.040 € 20/05/2026 20/08/2026 20/09/2026 20/03/2027 SECOND PHASE 64.000 € 1.400.000 € 56.000 € 10.080 € REGULARIZATION (AFO) ALL 120.000 € 20/08/2026 20/08/2028 GARAJE/ GARAGE Alhambra 19.000 € 500.000 € 20.000 € 3.600 € 20/08/2028 10/01/2029 20/05/2029 20/10/2029 GARAJE/ GARAGE Mezquita 19.000 € 500.000 € 20.000 € 3.600 € 20/08/2028 10/01/2029 20/05/2029 20/10/2029 FACADE PROJECT Doñana 32.000 € 700.000 € 28.000 € 5.040 € 20/08/2028 10/01/2029 20/05/2029 20/03/2030 FACADE PROJECT Alhambra 32.000 € 700.000 € 28.000 € 5.040 € 20/08/2028 10/01/2029 20/05/2029 20/03/2030 FACADE PROJECT Mezquita 32.000 € 700.000 € 28.000 € 5.040 € 20/08/2028 10/01/2029 20/05/2029 20/03/2030 THIRD PHASE 254.000 € 3.100.000 € 124.000 € 22.320 € TOTAL 342.200 € 5.370.000 € 214.800 € 38.664 €
Page 2
Owners’ Association Conjunto Señorío de Aloha BIDS FROM GARAGE OF Giralda / Giralda’S GARAGE RAMP OF Giralda / Giralda’S RAMP TOTAL VAT TOTAL+VAT BENICAM 554.425,98 € 202.276,82 € 756.702,80 € 75.670,28 € 832.373,08 € EDIGOMPER 518.108,57 € 179.190,59 € 697.299,16 € 69.729,92 € 767.029,08 € EQUITRON 579.966,23 € 207.141,41 € 787.107,64 € 78.710,76 € 865.818,40 €
Page 3
Owners’ Association Conjunto Señorío de Aloha REGULATORY NUMBER OCA ADAPTATION POSSIBLE REPAIRS OCA TOTAL (25) ELEVATORS 25 1.800 € 700 € 75 € 64.375 €