Owner-prepared summary. Original document is the authoritative source.
At a glance
- The circular dated 1 July 2022 informs owners about urgent maintenance such as cleaning terrace drains after heavy rains.
- It reports that the 2nd quarter General Meeting approved a 15% increase in community expenses and an extraordinary levy of €500,000 to fund essential infrastructure repairs.
- Financially, more than 85% of owners paid their third‑quarter fees on time, while legal action is being taken against 19 owners with outstanding debts.
- Service changes include the termination of the night‑guard service, a revised contract with HELP for mail handling and basic maintenance, and plans to install an electronic access‑control system.
- Upcoming items include a proposed 2023 General Meeting in March, continued pool renovation work, and energy‑saving initiatives such as LED lighting and a potential solar‑energy project.
Key decisions
- 1. Increase community expenses by 15% as approved at the 2nd quarter General Meeting.
- 2. Approve an extraordinary levy of €500,000 to finance essential infrastructure repairs.
- 3. Terminate the COFER night‑guard service as voted by owners at the General Meeting.
- 4. Approve the replacement and refurbishment of garage doors and motors for the Mezquita, Alhambra, and Giralda entrances.
- 5. Approve the repair of selected terraces affected by irrigation leaks and the shutdown of the automatic irrigation system.
- 6. Approve the budget for pool repairs, including conversion to salt‑water systems and installation of safety fencing and coded locks.
Page 1
SEÑORIO DE ALOHA NOTICES BULLETIN -PRESIDENT -2nd AND 3rd QUARTER 2022
Dear Owners, IMPORTANT MAINTENANCE NOTICE – At the beginning of this year, we experienced strong rains, some with sand content. Before the next winter/spring rains, ensure that the downspouts of your balcony are clean to avoid floods in your own apartment and primarily in your neighbors’ (as has happened in previous years). The main event of the 2nd quarter was the AGM 2022. It has not been possible to hold an AGM in almost 2 years, so there will be many new owners attending an AGM of Señorío for the first time. Without a doubt, for owners from other countries, the Owners’ Meeting in Spain may have been a very different experience. Despite the accumulation of problems and the difference of opinions, many topics were treated and debated in a heated manner, which resulted in many positive decisions making possible many repairs and changes in the community. The AGM was the first opportunity for owners to meet the new Administrator Adenjo Gestión SL, as well as Victor Porras and Andreas Norman, who are responsible for the in-situ management of repair works and daily operations within the community. We have significantly improved administrative resources so that the quality of the community is in line with the expectations of the owners. Perhaps the most significant decisions of the AGM were the approval by the owners to increase community expenses by 15% for the first time in almost a decade, and to approve a special assessment of 500,000.00 € to cover essential repairs to the main infrastructure. These essential repairs simply cannot be financed within a reasonable timeframe using the ordinary budget. This bulletin begins with an update on how these key initiatives are being implemented. In difficult economic times, burdening owners with more expenses is never an easy decision. And although it is not entirely popular, the fact that there was a high percentage of participation in the first part of the special assessment suggests that owners really want to support it; major repair works; compliance with health and safety standards; and regular preventive maintenance, all of which help save money for the community in the medium and long term. More than 85% of owners paid their community fees on time in the third quarter, and those who did not were, in most cases, long-term debtors that you knew through debtors’ reports. A question that many owners often ask is: “If I am paying, what happens to those who don’t pay?” In many communities, a 10-15% non-payment rate could be considered acceptable. In Señorío, it is not acceptable for the simple reason that most of the debt has been allowed to accumulate over many years, and at one point it exceeded half a million euros. This year, we have instructed lawyers to open new court proceedings against 19 owners who have become short- and medium-term debtors. This is in addition to the cases already in progress against long-term debtors. In these latter cases, Adenjo waited over 6 months to obtain the latest case information from the lawyer of Meridional, only to discover that there were no updates for the past 2 years! We have now appointed lawyers to determine the current status of these cases in court.
Page 2
Finally, Spanish legislation has moved to help communities deal with owners who do not pay their community fees. A law has been approved that allows communities to deny certain services to debtors. We are waiting for legal clarifications on how we can best apply the law and intend to do so. In November, the second payment of the special assessment approved was collected, and with respect to the first payment of the same, 80% was collected. The ownership share is the basis for calculating the fee that corresponds to each owner to pay from the total of the 500,000 € approved. In no case will the amount of those who do not pay be covered at the expense of the good will of those who do. As approved in the Owners’ Meeting, those who do not pay will be subject to a legally binding late payment penalty (the late payment penalty now applies to ordinary community fees as well as the special assessment). Having collected a significant amount of money from the special assessment, the program described and approved in the AGM is being implemented. Unfortunately, certain projects will cause inconvenience. For example, repairs to: balconies damaged by the irrigation system of the gardener, entrances to garages, and, no less importantly, the pools. Adenjo will try to notify owners as soon as possible about when, where, and how long the work will take place. A file on the community’s financial situation at the end of the third quarter (September) is attached to this bulletin. This has been prepared by our Accountant (CPA) and Vice-President Gerry Burke, based on the basic data provided by Adenjo. We enter the last quarter of the year with sufficient funds for essential repairs and the standard maintenance program is in place. Annual General Meeting 2023 The intention is to hold the next AGM during the 1st quarter of 2023, preferably in March. By then, we will have completed the preparation of the 2022 accounts and the finalization of the 2023 budget proposal. COFER Night Watchman / HELP Concierge Service The review of these services took a long time due to cost and efficiency problems as discussed in the AGM. There was much debate in the AGM, and owners approved the recommendation to end the night watchman service that consisted of a man at the main entrance reception, who made periodic walks around the community. Many owners felt comfortable with this service, but the plain truth is that there were robberies; real-time CCTV was not effective; the security service was not the best. The lack of willingness of the watchmen to intervene in many aspects of antisocial behavior; a lack of willingness on many occasions to contact the police when requested by owners… and a very unfortunate incident of attempted robbery in a property. In summary, much expense for very little security. Also, it is evident that most antisocial behavior, whether it is noise from apartments; activities around the pools; damage to community property, such as entrance portals, elevators, doors, etc. comes from short-term rental clients. It is very likely that the 2023 AGM will include a proposal for a summer night watchman to help control these incidents. Meanwhile, and in line with the AGM approval, the COFER service was terminated in September. This now means that, as is quite common in other places, if there is a security problem that concerns you, owners must be prepared to call the police directly. Despite language barriers, the Spanish police in our area have a good record of response and help for foreigners and locals alike to deal with incidents. Also, in the next AGM, a proposal will be made for the introduction of a “Security Access Control System”. This will link access to external gates/pool entrances, entrance portals, and pools to a single electronic remote control system. Owners will have the option to control access from within their apartments and/or through their mobile phones. This will reduce unauthorized access to the community and make entry points more secure. It is worth noting that the closed-circuit television system is in continuous operation, and the police can view it retrospectively in the event of an incident. Utecma, the CCTV maintenance company, periodically reviews the recording system and cameras. In the event that the Police request it, Utecma sends the recordings to the Police. The concierge has fulfilled three main purposes; giving access through the main entrance (unfortunately to more or less anyone); receiving mail; and making occasional community walks. Most owners approved a proposal from the AGM to reorient the service and improve the quality-price ratio and impact on the community. From December 10, 2022, HELP will provide personnel whose work tasks will include; receiving mail/packages for a limited daily period; performing backlog maintenance work; and on-site support for owners (but without acting as a watchman). The maintenance component is the most significant part of the revised workload. Despite Luis’s efforts and the progress made in important repair works, a quick walk around the community reveals that we still have to perform many basic maintenance tasks, particularly painting work. The revised working hours for HELP are: Monday to Friday from 08:00 to 14:00 and from 16:00 to 22:00. Weekends/Holidays 16:00-22:00. To make it clear, this additional maintenance resource is for the maintenance of common areas and not for private matters. We are aware that security is always a major concern, perhaps even more so for non-resident owners. The landscape of home security systems has evolved rapidly, and we recommend that you seek options for your property that suit your needs. Also, ensure that you have a property insurance with broad coverage. Do not rely on community insurance for incidents within your property, it will not cover you.
Page 3
IRRIGATION SYSTEMS Approval was given in the AGM to repair a limited number of apartment balconies more affected by the prolonged leakage of water from the gardener’s irrigation system. Also, approval was given to turn off the automatic irrigation system to prevent further damage. The repair of the initially selected balconies provides valuable information on the scale of work that may be needed throughout the community. One thing that is already evident is that the gardeners containing small trees and shrubs have significantly damaged the bases of the planters, causing water (not just from the irrigation system but also from rain water) to seep into the metal frames of the balconies. This causes corrosion that is visibly evident in the brown stains on the main facades of each building. We hope that now owners understand the problem with trees and shrubs, and will change them for more suitable plants. With the first balconies selected, we had requests to completely remove the gardeners. This is not within the scope of the project, as the gardeners are a characteristic architectural feature of the community. The results of the completed repairs will be reported in the next Owners’ Meeting with a proposal on how this work should be extended to other damaged balconies. POOLS As previously reported, the pools of Señorío do not comply with current legislation, in that a “inspector” could close the pools. Moreover, many years of zero maintenance created leaks and malfunctioning equipment. The Board approved a single budget to repair the three groups and attempt a minimum legal compliance. Those owners who used the pools this summer may have had the opportunity to experience the effect of “salt water”. Salt water is not only a healthier alternative for eyes and skin compared to chlorine-based pools, but it also reduces the cost of other chemicals by approximately 10,000.00 € per year, in addition to reducing pool and equipment wear. At the end of summer, repair work on the Triana/Giralda pool began. Unfortunately, once emptied and inspected, undetected problems were discovered that required significant earth movements to replace pipes and other infrastructure of the pool. Unfortunately, this caused delays and additional inconvenience for residents, but we were able to cover the additional costs of contingency planning. From a security perspective, owners will notice that safety barriers for children and gates with locks have been installed around the perimeters of the pools. This was an important legal requirement. For owners who want to use the pool areas outside the “pool season”, access will be through the main gates that will have coded locks to restrict access to children without accompanying adults. The use of pools without lifeguards is entirely the responsibility of the owners. With the reopening of the Triana pool in early December, work on the central pool will begin. Working in this order means that we will transfer the water from the central pool to the Triana pool and save approximately 4,000 € in water costs.
Page 4
GARAGE REPAIRS Older owners will be aware of a court case that has been ongoing for approximately a decade against the Señorío Constructor, FCC. This relates to defective work that affects the insulation at ground level that protects the garage levels in Giralda, Alhambra, and Mezquita. Many of you will have witnessed how rainwater seeps into the garages and has affected the integrity of some parts of the roofs and walls. Over the years, we have had many false dawns regarding the compensation of a successful court outcome. While progress has been made this year in the courts, the final date is still unclear. As you know, the special assessment approved in the Owners’ Meeting was intended to cover repairs to the garages, but following the advice of our lawyers, we are waiting for the matter to be clarified before starting the repairs. Owners will be informed as the information becomes available. When it was built, the Mezquita garage was designed to have a ventilation outlet at the end of the garage that exits to the other side of the tennis court. The system was never completed, and the area was sealed to prevent rain. This restricted airflow through the garage and voided the warranty. During the summer, the necessary panels were installed to allow better airflow and prevent rain.
Page 5
GARAGE ENTRANCES AND ENTRANCES After constant breakdowns, the rusty doors of Mezquita and the doors of Alhambra/Giralda have been replaced. The motors and some of the door arms have been reconditioned. If a door does not open, the worst thing you can do is try to force it, do not do it, it will not work properly. To report a problem, contact HELP through the site security number or call Adenjo. FAIN, whose phone numbers (900806180) are published on the doors, is the contractor for the service and repairs, and can be contacted directly during emergencies outside working hours. The garage entrances are designed to be resistant and secure, but they need maintenance, otherwise, replacing them is very expensive. Victor’s evaluation was that our entrances were in poor condition, although not evident to the daily user. The recent works have improved the entrances for the next few years with a minimum of maintenance. Be careful in the first weeks of use, especially in wet conditions while the surfaces gain traction as they are used.
Page 6
PIPE BREAKAGES We have experienced pipe breakages this summer. Apart from inconveniencing affected owners, there are collateral damages, particularly in storage rooms, due to flooding. With literally hundreds of pipes in the community, it is impossible to predict a random breakage. In the case of these pipes, we suspect that a combination of low-specification pipes and excessive water pressure may have contributed significantly. Water pressure from the meters has been adjusted… if you consider that the water pressure in your taps is excessive, inform Adenjo’s staff. Immediately report to Adenjo in the event of water in common areas or particularly in storage rooms; you can save them a lot of headaches and costs for another owner. We also experience unpredictable pipe breakages of water drainage or sewage. These are impossible to predict, but may occur due to incorrect modifications in the bathroom and kitchen of owners. If you plan to initiate any work involving this type of pipe change, you must request Adenjo to inform our engineer Victor to approve the work, and finally connect to the community’s common pipe network. ALTERATIONS/AMENDMENTS TO FLOORS It is very likely that this topic will become one of the most contentious in the community. Owners want to modernize their property, but they need to work within the law and community rules, also to protect the architectural integrity of the community. Over the years, previous administrations have not enforced the law and community rules, and this is evident in a quick walk around the community. Owners have become accustomed to doing what they want and, in some cases, even believing that established precedents by other owners allowed them to repeat modifications. This simply is not correct, and the decrease in uniformity along with the non-compliance with good cleaning rules is increasingly giving the impression that Señorío looks like a gypsy slum. Adenjo/Victor are now starting to take measures in a series of problems, and here are some examples: • We request the reinstatement of awnings that are not installed correctly and could fall and injure people. If not, we will notify the Town Hall and the courts. In the event of an accident, the community should not be held responsible for the negligence of owners. • Gardeners and planters. Inclined planters are another safety hazard that must be removed or turned inward. • Planters that have grown too large and their remains (leaves, berries, etc.) go to the apartment below, not only annoying the neighbor but also blocking the balcony drains. Owners must take responsibility. • Owners of ground-floor apartments who water their planters to the point of overflowing and flooding the common area corridors, which poses a safety risk and damages the flooring.
Page 7
RISK SAFETY CAMPING DRAINAGE LOWER TERRACE
Page 8
BEFORE AFTER REPAIRED AND ASPHALTED
Apart from the topics discussed in the AGM, other of interest are the following:
Page 9
PIPE BREAKAGES This summer, we have experienced pipe breakages. Apart from inconveniencing affected owners, there are collateral damages, particularly in storage rooms, due to flooding. With literally hundreds of pipes in the community, it is impossible to predict a random breakage. In the case of these pipes, we suspect that a combination of low-specification pipes and excessive water pressure may have contributed significantly. Water pressure from the meters has been adjusted… if you consider that the water pressure in your taps is excessive, inform Adenjo’s staff. Immediately report to Adenjo in the event of water in common areas or particularly in storage rooms; you can save them a lot of headaches and costs for another owner. We also experience unpredictable pipe breakages of water drainage or sewage. These are impossible to predict, but may occur due to incorrect modifications in the bathroom and kitchen of owners. If you plan to initiate any work involving this type of pipe change, you must request Adenjo to inform our engineer Victor to approve the work, and finally connect to the community’s common pipe network. ALTERATIONS/AMENDMENTS TO FLOORS It is very likely that this topic will become one of the most contentious in the community. Owners want to modernize their property, but they need to work within the law and community rules, also to protect the architectural integrity of the community. Over the years, previous administrations have not enforced the law and community rules, and this is evident in a quick walk around the community. Owners have become accustomed to doing what they want and, in some cases, even believing that established precedents by other owners allowed them to repeat modifications. This simply is not correct, and the decrease in uniformity along with the non-compliance with good cleaning rules is increasingly giving the impression that Señorío looks like a gypsy slum. Adenjo/Victor are now starting to take measures in a series of problems, and here are some examples: • We request the reinstatement of awnings that are not installed correctly and could fall and injure people. If not, we will notify the Town Hall and the courts. In the event of an accident, the community should not be held responsible for the negligence of owners. • Gardeners and planters. Inclined planters are another safety hazard that must be removed or turned inward. • Planters that have grown too large and their remains (leaves, berries, etc.) go to the apartment below, not only annoying the neighbor but also blocking the balcony drains. Owners must take responsibility. • Owners of ground-floor apartments who water their planters to the point of overflowing and flooding the common area corridors, which poses a safety risk and damages the flooring.
Page 10
In the case of these examples, it is just a small part of what is to come. Substantial changes have been made in a series of apartments with the aim, in many cases, of increasing the habitable surface area. These changes can affect the IBI (property tax) as well as the ‘habitable surface area coefficient’ used to calculate community fees. In almost all cases, a permit from the Town Hall is required to make these changes, and post-inspection, both prior and subsequent to the work, must be carried out by a qualified topographer (Expert). This is especially important when modifying pipes, as this can directly affect the community’s common systems such as, for example, waste disposal networks. Owners must understand that sharing plans and permits with Adenjo before starting work can save time and costs. Recently, an owner wanted to make changes to one of their bathrooms. First, they contacted Adenjo to understand what to do (obtain a permit from the Town Hall) and shared their construction plan with Victor. Subsequently, Victor visited the apartment and approved the modifications. This simple cooperation between owner and administration eliminates potential conflicts or legal actions, in addition to guaranteeing the integrity of the community’s architecture. The current community rules on modifications (a copy was sent to you before the last AGM) are precise but vague, except to say that there is a limit to changes to the exterior of your property. In the next AGM, we will propose modifications to these norms to make them easier to understand.
Page 11
STORAGE ROOMS AND PARKING SPACES There is a continuous problem with furniture and personal items left in the corridors of storage rooms and under the stairs. It is known that often these belong to owners who rent out their properties and change and remove things at the whim of their tenants. This not only causes inconvenience to other owners (we receive many complaints) but also is not allowed under the community’s insurance terms. This also occurs in parking spaces where many owners think they can store things, and it is not allowed, as in the event of an incident, the community’s insurance will not respond. Adenjo will send a circular to all owners formally requesting the removal of these personal items within a considerable period, before organizing their removal at the owner’s expense. We are sure that we all want to see our community tidy and, above all, safe from unnecessary risks.
Page 12
VENTILATION OF STORAGE ROOMS The combination of poor ventilation, water damage, and blocked drains has caused ventilation and mold problems in several storage room areas. According to the community’s insurance, it is not allowed to mix the ventilation of garages with that of storage rooms. In the event of a fire, the insurance would not pay. To solve the problem, a ventilation system with overpressure must be created to introduce external air into the storage room area. Currently, several options are being evaluated.
Page 13
CLEANLINESS Comments indicate that, in general, community cleanliness has improved. However, it is clear that the influx of visitors during the summer is a challenge. It is also clear that complacency by the cleaners is low when they are not properly supervised. We have not been satisfied with the supervisor for some time and will not renew the contract at the end of the year. (Those owners who noticed the mobile phone stuck to the cleaner’s ear… we are also dealing with this problem)
Page 14
ANTISOCIAL BEHAVIOR While it was great to see people returning to Señorío after the pandemic, the summer period was witness to many antisocial behaviors centered on: Night parties on the balcony, and in some cases with numerous guests who do not reside in the community. Other owners observed visitors; urinating in portals and gardens; entering pools at late hours; throwing cigarettes and drinks from balconies; and, of course, excessive noise. The police were called on several occasions and by several owners directly, partly because our watchman did not consider calling the police himself. Graffiti inside and outside portals, and in elevators. Visitors park recklessly in ‘private parking spaces’, causing a great inconvenience for owners of parking spaces. Just as badly as those drivers who do not bother to park their cars without obstructing the parking space of their neighbors. There are many dog owners, but only a few allow their dogs to defecate within the community. Despite all the warnings and the total lack of respect for our gardeners and cleaners who regularly face this problem. Such behavior in public areas is severely punished by Spanish law, and now we are studying options for the community to sanction owners who do this.
Page 15
OWNER REPRESENTATIVES GROUP We are in a continuous improvement process throughout the community, and, of course, each day brings new challenges. We have received many positive comments from residents and visiting owners, so it seems that we are making real progress. As more and more owners become interested in the community, could this be the time for interested owners to get more involved to help shape the work to be done? Frankly, I am not interested in making the administration accountable to a small group of owners through quarterly or semi-annual reviews… The administration is accountable annually to all owners as required by law here in Spain. However, I am open to capturing a few owners to work with the “management team”, particularly on qualitative matters that directly affect owners, and where future actions align with the general opinions of owners. Examples of this include, but are not limited to; Community rules on modifications; community green areas including apartment gardeners; minimizing the impact of rental properties; updating and modifying community rules; evolving recreational facilities; and optimizing community security, etc. A “working group” of owners would review the types of modifications that already exist in the community to develop recommendations for future modifications. They would be guided by what is legal, practical, and aesthetically acceptable. Consulting with the “management team”, the working group would develop a proposal for the AGM. This is just an example; others could include a group to determine how to deal with antisocial behavior; pool protocols; improving the community meeting room; etc. etc. If you are interested in joining a team of owners with similar ideas to serve the community, then, initially, write to Adenjo to express your interest. It is likely that a Special Meeting will be required to formalize this initiative.
Page 16
USE OF LUIS FOR PRIVATE MATTERS Several owners have asked for clarification on this point. While Luis is willing to help owners with repairs to their apartments, this is problematic from the administration’s point of view. Regardless of the number of community tasks/repairs that Luis has, he is called during his working hours to attend to private work. This also has legal implications. We request owners not to do this, as it not only creates a conflict of interest for Luis but also affects the community work scheduled.
Page 17
STRAY CATS There is a number of stray cats within the community that it is not advisable to keep. At the same time, there are owners with domestic cats who leave food.
Page 18
NAÔ POOL CLUB NAÔ opened in May and closed in September. All communities in the area were subjected to significantly higher noise pollution than legal limits: 12 hours of mental torture is what many owners describe the events of NAÔ’s party. In addition, there have been many problems with: Antisocial behavior of clients; Congestion of parking spaces; Extended opening hours illegally. The police and the Town Hall were silent in response, despite the complaints from owners in various communities affected. Committing to the management of the club was useless, and, given the great promotion made, it is likely to worsen and pose a real threat to property values in the area. A meeting of presidents/administrators of the different communities has resulted in a common action plan. A Special Meeting will be held before the Annual General Meeting in March to have our community approve the joint collaboration with neighboring communities.
Page 19
ENERGY INITIATIVES Energy costs are increasing in Spain, and we have launched a series of initiatives to contain the increases as much as possible. Our project to install LED lighting wherever possible means that internal/external lighting in common areas, garages, elevators, pools, etc. has significantly reduced electricity consumption. The Spanish electricity market is very complex, and, given that the current electricity contract expires in November, we are working with an “electricity consultant” to completely reconfigure the numerous electricity contracts that cover different areas of the community. This affects tariffs, electricity consumption category, and variable time ‘power’. (Your apartment’s electricity bills explain the details of the different components in the cost structure). Our opinion is that we have been paying too much for electricity, and that by reconfiguring how and when we consume electricity, along with the efforts of the consultants to get better tariffs with energy commercializers, we can compensate for a large proportion of the cost increases across the country. If you are not aware, all electricity contracts that will be renewed after May 26, 2022 will have a “gas limit” applied due to the use of gas for electricity generation in Spain. In addition to reconfiguring our electricity costs, we are now evaluating the economics and practical aspects of installing solar energy systems. This is added to the Spanish legislation introduced this year that aims to: create financing options to encourage communities to modernize their buildings to make them more energy-efficient; and, at the same time, offer subsidies to communities that install renewable energy systems (although it is not clear when these subsidies will be paid). Our goal is to present a solar energy proposal at the next Owners’ Meeting.
Page 20
CHIMNEYS Some owners have reported problems with smoke when using their chimneys. A review of the chimney system reveals that each apartment has its own chimney flue that then connects to the common chimney that exits the building roofs. In the event of a problem, owners are encouraged to clean their own chimney flue. It is not feasible for the community to clean all chimneys. In the event of a large number of chimney problems from a shared chimney, the community will organize an inspection to determine the problem.
Page 21
COCKROACHES Love them or hate them, they can be a regular problem. The community has a pest control company that treats common areas of the buildings on a quarterly basis, but they can still appear, especially in damp areas. If you suspect you have a pest problem, inform Adenjo and they will call the pest control company.
Page 22
ADELFAS STREET This is the access street to Giralda, Alhambra, and Mezquita. Occasionally, we are contacted about who is responsible for services on this street, so let me clarify. The street is a public road, and the Community has no responsibilities except for the following: • The lighting located on the perimeter wall of Señorío. This serves both public lighting and community lighting. There is no public lighting on the opposite side of the street, and the Town Hall seems to have no plans to install it. • The small green areas between the wall and the pavement outside Alhambra and Giralda. Our maintenance in these areas includes removing trash, bottles, etc., but it is an endless task due to the following reasons: The trash bins and surrounding areas are the responsibility of the Town Hall. They cause a great problem of trash when they overflow or when owners or the public in general are simply irresponsible in disposing of trash. It is for this reason that, especially with wind, the entire street and gardens can look like a total disaster. If you see it very badly, inform the Town Hall or call Adenjo. Due to the parking problems in the street caused by the NAÔ pool club, we have installed bollards outside Mezquita. This means that the entire length of the community on this street has bollards to restrict parking on the opposite side of the street.
Page 23
Merry Christmas and a Happy New Year 2023. John Riley President