Comunidad de Propietarios · Marbella, Málaga
Transparent governance · Public record · Open archive
Home / Documents / Technical Report

Technical Report

25 documents · 2024 — 2026

2026

20 documents
  1. Architect's Memorandum — Giralda, December 2026

    Adenjo Gestión SL ENESSVFRAR G T D A M
  2. Pathology Report — all buildings, 2026

    Adenjo Gestión SL ENESSVFRAR G T D A M
  3. Pathology Report — Doñana, 2026

    Adenjo Gestión SL ENESSVFRAR G T D A M
  4. Annex A — Plans (all buildings, January 2026)

    Annex A – Plans (all buildings, January 2026) is a technical report prepared by architect Francisco Manuel López Chacón for the Conjunto Señorío de Alhoa, dated 31 December 2026 and based on a field survey conducted in November 2025.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  5. Annex A — Plans (Giralda, December 2026)

    Annex A – Plans for the Giralda building was issued on 31 December 2026.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  6. Architect López Chacón — Annex Plans

    The document is titled "Architect López Chacón — Annex Plans" and is a technical report dated 31 December 2026.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  7. Full Pathology Report — Architect López Chacón

    The report titled "Full Pathology Report – Architect López Chacón" was issued on 31 December 2026 and presents the findings of a building‑envelope inspection for the residential complex Señorío de Alhoa in Marbella, Málaga.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  8. Architect's Plans — Triana

    The document titled "Architect's Plans — Triana" is a technical report dated 31 December 2026 prepared by architect Francisco Manuel López Chacón (collegiate number 1467, COA Málaga).

    Adenjo Gestión SL ENESSVFRAR G T D A M
  9. Architect's Technical Parameters — 2026

    The report dated 31-12-2026, prepared by architect Francisco Manuel López Chacón, assesses structural and safety deficiencies in the Señorío de Aloha residential complex in Marbella.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  10. Elevation Drawings — Alhambra

    The document titled "Elevation Drawings — Alhambra" is a technical report dated 31 December 2026.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  11. Elevation Drawings — all buildings, overview

    The document titled 'Elevation Drawings — all buildings, overview' is a technical report dated 31 December 2026.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  12. Elevation Drawings — Doñana

    The document titled 'Elevation Drawings — Doñana' is a technical report dated 31 December 2026.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  13. Elevation Drawings — Giralda (V1)

    The document titled "Elevation Drawings — Giralda (V1)" dated 31 December 2026 is a technical report on envelope pathologies for the Conjunto Señorío de Aloha in Marbella, Málaga.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  14. Elevation Drawings — Mezquita (overview)

    The document titled "Elevation Drawings — Mezquita (overview)" is a technical report dated 31 December 2026.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  15. Elevation Drawings — Mezquita (southwest)

    The document is a technical report dated 31 December 2026 titled 'Elevation Drawings — Mezquita (southwest)'.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  16. Elevation Drawings — Triana (V1)

    The document titled "Elevation Drawings — Triana (V1)" is a technical report dated 31 December 2026.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  17. Technical Report — Updated Information (2026)

    The report dated 31 December 2026 provides an update on the community’s infrastructure program and the ongoing process to obtain an independent second opinion.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  18. Architectural Drawings — Detail C (scan)

    The document is a set of 11 architectural drawings for the re‑impermeabilisation of roofs in common areas and structural repair of the garage of Edificio Giralda, located at Cjto. Señorío de Aloha, Av. Manolete, Marbella (CP 29660).

    Adenjo Gestión SL ENESSVFRAR G T D A M
  19. PGOU Location Map (V1)

    The document is a technical report titled "PGOU Location Map (V1)" dated 31 December 2026, presenting the current state and pathology findings for the residential complex Señorío de Alhoa in Marbella, Málaga.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  20. Technical Report — Updated Information (2026)

    The report dated 31 December 2026 provides an update on the infrastructure programme and the planned independent second opinion.

    Adenjo Gestión SL ENESSVFRAR G T D A M

2025

1 document
  1. Security Maintenance Update — April 2025

    The community replaced night security and daytime concierge services with an electronic access control system that includes key fobs, remote garage controls, and a new intercom network.

    Adenjo Gestión SL ENESSVFRAR G T D A M

2024

4 documents
  1. Access Control System — July 2024

    A decision taken at the 2022 AGM approved a complete overhaul of the community security system with a one‑time capital cost of approximately €150-160k, to be implemented over two financial years.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  2. ACOSOL Notice — Water Supply

    An urgent notice was issued due to a severe water shortage.

    Adenjo Gestión SL ENESSVFRAR G T D A M
  3. ACOSOL Notice — Water Supply

    An urgent notice was issued due to severe water scarcity, requiring a reduction to 160 liters per person per day.

    ACOSOL (Aguas del Pinar SL) a través de Adenjo Gestión SL ENESSVFRAR G T D A M
  4. Special-Assessment Notice — Works

    Payment notice for the special levy of €380 per participation coefficient approved at the 10 January 2024 EGM.

    Adenjo Gestión SL ENESSVFRAR G T D A M